The pool is scheduled to be opened on the 1 June 2021 with latest
Covid measures in place for operation. Please follow instructions when signing in at the entrance to the building.
The pool is scheduled to be opened on the 1 June 2021 with latest
Covid measures in place for operation. Please follow instructions when signing in at the entrance to the building.